Past Projects

Take a look at our past projects from across BC

DISTrict OF LILLOOET WATER TREATMENT

  •  3000 sq.ft. masonry building with architectural finish
  •  2 vertical turbine pumping units, 4 submersible pumping units
  •  installation of owner-supplied filtration skids, ancillary equipment, supports and connections
  • concrete loading ramp
  • related building mechanical and electrical

Whistler Equilization line

  • equalization line from digester tank 1 to tank 2
  • custom fabricated and fit 12″ HDPE line to connect the 2 tanks
  • coring of 18″ holes through 8″ reinforced walls
  • install of 12″ pinch valve on a concrete pad

Oliver wastewater lagoon maintenance

  • raise aerators 
  • inspect and replace membranes
  • replace retrieval ropes and floats 
  • put back into service
  • completed 54 aerators for town of oliver

Penticton Airport

  • install new prefab sanitary lift station
  • install new sanitary piping and manholes
  • install new water mains and hydrant

PARKLAND BOOSTER STATION, GIBSONS BC

  • construct a 43 m2 booster pumping station including chlorine disinfection;
  • install emergency generator;
  • install Approximately 70 metres of 150mm watermain and 40 metres of 200mm watermain and 

         appurtenances;

  • tie watermain into existing 200mm watermain; and,
  • install check valve and metered bypass on Reed Road.