DISTrict OF LILLOOET WATER TREATMENT
- 3000 sq.ft. masonry building with architectural finish
- 2 vertical turbine pumping units, 4 submersible pumping units
- installation of owner-supplied filtration skids, ancillary equipment, supports and connections
- concrete loading ramp
- related building mechanical and electrical
Whistler Equilization line
- equalization line from digester tank 1 to tank 2
- custom fabricated and fit 12″ HDPE line to connect the 2 tanks
- coring of 18″ holes through 8″ reinforced walls
- install of 12″ pinch valve on a concrete pad












Oliver wastewater lagoon maintenance
- raise aerators
- inspect and replace membranes
- replace retrieval ropes and floats
- put back into service
- completed 54 aerators for town of oliver
Penticton Airport
- install new prefab sanitary lift station
- install new sanitary piping and manholes
- install new water mains and hydrant











PARKLAND BOOSTER STATION, GIBSONS BC
- construct a 43 m2 booster pumping station including chlorine disinfection;
- install emergency generator;
- install Approximately 70 metres of 150mm watermain and 40 metres of 200mm watermain and
appurtenances;
- tie watermain into existing 200mm watermain; and,
- install check valve and metered bypass on Reed Road.